In our Acacia Mining Hanönü project, we continue our site operations at full speed. Within the scope of the works carried out in the uplift stages, bottom and top drainage geocomposite, geosynthetic clay liner and HDPE geomembrane are used. The "liner integrity test" method of all geomembrane surfaces is also being tested against leak detection.